Thursday, June 25, 2009

More Drive Work

Went up today to sidecut the drive getting it ready for a dedication ceremony the July. Finished and checked the rest of the trail network and found everything in order.

At the beginning of the blue trail the birds were very active even in the late morning. It is nice to hear the woods so active.

The falls was flowing, but even with the rain it was at medium capacity.

Sunday, June 21, 2009

June Tail Work

I have finally made it back up to Pilot Knob Ridge after making it through the long weekends I have had due to work. Today, I was asked to clear out the drive that is part of the orange trail in preparation for work that is going to be done at the Gazebo. I believe that a generous patron is donating a bench and funds to refurbish the gazebo and the LGLC needs the drive clear so they can get materials up and people up for the dedication in July.

I removed two rock cairn that I placed in the drive where the drive turn off into the woods. I also removed two downed tree and a few leaning trees that would interfere with the drive up. Anyhow the drive is clear as is the rest of the orange trail as I found a couple of downed trees on the way down.

For me a good way to spend a couple of hours on Father's Day